| With the seams finished and the turf trimmed, the granite gravel is ready for the fringe to be added. At this point about 40 percent of the infill has been installed into the fibers of the putting green. Return to Putting green installation Return to previous step in the installation. Go to the next step in the installation. |
![]() |